Skip to content
JANOVA Access · Intercom
Middle East

United Arab Emirates Access Control & Video Intercom

UAE projects are usually high-specification offices, hotels and villas where finish and visitor flow matter. The grid is 230 V / 50 Hz, and outdoor heat, dust and salt require IP-rated hardware and corrosion-resistant finishes. Jebel Ali or Khalifa Port are the usual gateways; ESMA / ECAS registration is confirmed per model and importer.

  • 230 V / 50 Hz
  • Jebel Ali, Khalifa Port
  • 15–22 days
United Arab Emirates

Quick answer

UAE projects are usually high-specification offices, hotels and villas where finish and visitor flow matter. The grid is 230 V / 50 Hz, and outdoor heat, dust and salt require IP-rated hardware and corrosion-resistant finishes. Jebel Ali or Khalifa Port are the usual gateways; ESMA / ECAS registration is confirmed per model and importer.

Market snapshot

Market snapshotNotes
Voltage / frequency 230 V / 50 Hz
Currency AED
Main ports Jebel Ali, Khalifa Port
Typical sea transit 15–22 days
Certification & registration ESMA / ECAS — Confirm per model and importer
HS code Confirmed per model by the customs broker

Market-specific note

Typical sea transit is indicative; confirm the route and schedule with the forwarder before fixing a delivery date.

What we need for a quote

Site type, door or apartment count, existing cable, target country and timeline.

Common project pain points

What usually needs a local decision.

Heat, humidity and salt

Multi-site and multi-building

Labor and attendance

Tailgating and visitor flow

Recommended configuration

ScenarioRepresentative modelsNotes
Hotels MC-S603LH3, PRO3000, HA-MCR45-32 5 deployment checks
Office Buildings CD-Z358, SW-HA-8ZI, SW-ZCFE-21.5 6 deployment checks
Villas & Townhouses PQ VEP7-CM2, TUYA TY75T-HTD2, AHD A72T-HTD2 5 deployment checks

Logistics & clearance

PortTransit
Jebel Ali 15–22 days
Khalifa Port 15–22 days
Local scenarios

Start from the site, not the model list.

Frequently asked questions

Questions for United Arab Emirates

What power supply should we plan for United Arab Emirates?

Plan for 230 V / 50 Hz with dedicated circuits and thermal management in plant rooms; confirm the site load and backup strategy.

Which port and transit time apply?

Jebel Ali and Khalifa Port are the usual gateways; sea transit is typically 15–22 days, with Jebel Ali offering frequent sailings.

What certification is required?

ESMA / ECAS is confirmed per model and importer; provide the product list and destination emirate before production.

What should we include in an inquiry?

Send the project type, door and lift count, consultant specification and target handover date; we will return a compliant configuration.

Still have a question? Contact

Get a quote

Share the site type, number of doors or apartments, and the functions you need. We will reply with a recommended configuration and a quotation.

By submitting this form you agree that we may contact you about this inquiry. We do not sell your data. Privacy policy

Next step

Send the destination and the door list.

We will confirm voltage, ports, certification and documentation before the quotation.