Access control and video intercom solutions for every site.
Offices care about the morning peak, residences about residents and couriers, construction sites about real-name records, hospitals about restricted areas and evacuation. Start with the site, then the model.
- 8 application guides
- Reference architecture
- Deployment checklist
Draw the people flow before the access control device list.
Every design starts with four questions: who enters, where, at what peak rate, and what cable already exists. Different answers produce different configurations.
People flow
Staff, visitors, contractors, residents, vehicles — each may need a different lane.
Existing wiring
Two-core, four-core or network cable often decides the technology before the spec sheet.
Security boundary
Where does public access stop and restricted access begin?
Platform fit
The controller, lift, fire and building platform interfaces must be known.
Application scenarios at a glance
| Scenario | Best for | Recommended models | deployment checks |
|---|---|---|---|
| Office Buildings | Lobby, floors and back-of-house | CD-Z358, SW-HA-8ZI, SW-ZCFE-21.5 | 6 deployment checks |
| Campuses | Gates, dormitories and attendance | CD-Z158, SW-HA-8ZI, TFS28 | 5 deployment checks |
| Industrial Parks | People, vehicles and shifts | CD-Z158, TM-AI08FW, TM-UAC109 | 6 deployment checks |
| Residential Communities | Gates, units and apartments | CD-Z358, SW-HA-8EZI, TUYA TY75T-HTD2 | 5 deployment checks |
| Construction Sites | Real-name access and attendance | CD-Z158, SW-HA-8EZI, TM-AI08FW | 5 deployment checks |
| Hospitals & Clinics | Staff, patients and restricted areas | SW-HA-8ZI, MC-516R15IPD2-7, PRO3000 | 5 deployment checks |
| Hotels | Guest rooms and back-of-house | MC-S603LH3, PRO3000, HA-MCR45-32 | 5 deployment checks |
| Villas & Townhouses | Gate, door and indoor monitor | PQ VEP7-CM2, TUYA TY75T-HTD2, AHD A72T-HTD2 | 5 deployment checks |
Frequently asked questions
What can you customize for OEM / ODM projects?
What documents and support come with an order?
Can we test a sample before the bulk order?
Still have a question? Contact
Send the site conditions. We will map them to a design.
A floor plan, door list, site photos and the existing platform model are the four inputs we need for an executable configuration.