Skip to content
JANOVA Access · Intercom
South Asia

Sri Lanka Access Control & Video Intercom

Sri Lanka projects often start with hotel and office refurbishments where the existing riser cable decides between 2-wire and IP. The grid is 230 V / 50 Hz, and coastal humidity makes IP-rated outdoor hardware and corrosion-resistant finishes important. Colombo is the main gateway; SLSI confirmation and a clear importer contact should be settled before production.

  • 230 V / 50 Hz
  • Colombo
  • 10–16 days
Sri Lanka

Quick answer

Sri Lanka projects often start with hotel and office refurbishments where the existing riser cable decides between 2-wire and IP. The grid is 230 V / 50 Hz, and coastal humidity makes IP-rated outdoor hardware and corrosion-resistant finishes important. Colombo is the main gateway; SLSI confirmation and a clear importer contact should be settled before production.

Market snapshot

Market snapshotNotes
Voltage / frequency 230 V / 50 Hz
Currency LKR
Main ports Colombo
Typical sea transit 10–16 days
Certification & registration SLSI — Confirm per model and importer
HS code Confirmed per model by the customs broker

Market-specific note

Typical sea transit is indicative; confirm the route and schedule with the forwarder before fixing a delivery date.

What we need for a quote

Site type, door or apartment count, existing cable, target country and timeline.

Common project pain points

What usually needs a local decision.

Heat, humidity and salt

Power stability

Import clearance

Legacy wiring

Recommended configuration

ScenarioRepresentative modelsNotes
Hotels MC-S603LH3, PRO3000, HA-MCR45-32 5 deployment checks
Office Buildings CD-Z358, SW-HA-8ZI, SW-ZCFE-21.5 6 deployment checks
Residential Communities CD-Z358, SW-HA-8EZI, TUYA TY75T-HTD2 5 deployment checks

Logistics & clearance

PortTransit
Colombo 10–16 days
Local scenarios

Start from the site, not the model list.

Frequently asked questions

Questions for Sri Lanka

What power supply should we plan for Sri Lanka?

Plan for 230 V / 50 Hz and confirm whether the site has a backup generator or UPS; coastal humidity also requires protected enclosures.

Which port and transit time apply?

Colombo is the usual gateway; sea transit is typically 10–16 days, with schedule changes around monsoon and congestion.

What certification is required?

SLSI is confirmed per model and importer; provide the product list and end-use so the importer can check the scope.

What should we include in an inquiry?

Send the hotel or office layout, door and apartment count, existing riser cable and target opening date; we will return a configuration.

Still have a question? Contact

Get a quote

Share the site type, number of doors or apartments, and the functions you need. We will reply with a recommended configuration and a quotation.

By submitting this form you agree that we may contact you about this inquiry. We do not sell your data. Privacy policy

Next step

Send the destination and the door list.

We will confirm voltage, ports, certification and documentation before the quotation.