Skip to content
JANOVA Access · Intercom
West Africa

Nigeria Access Control & Video Intercom

Nigeria projects often need apartment intercom, office access control and perimeter turnstiles in the same development. The grid is 230 V / 50 Hz, with frequent dips and generator changeover; power design and fail-safe locks matter as much as the reader. Lagos (Apapa / Tin Can) or Onne are the usual ports; SONCAP and clearing documents should be confirmed early.

  • 230 V / 50 Hz
  • Lagos (Apapa / Tin Can), Onne
  • 28–38 days
Nigeria

Quick answer

Nigeria projects often need apartment intercom, office access control and perimeter turnstiles in the same development. The grid is 230 V / 50 Hz, with frequent dips and generator changeover; power design and fail-safe locks matter as much as the reader. Lagos (Apapa / Tin Can) or Onne are the usual ports; SONCAP and clearing documents should be confirmed early.

Market snapshot

Market snapshotNotes
Voltage / frequency 230 V / 50 Hz
Currency NGN
Main ports Lagos (Apapa / Tin Can), Onne
Typical sea transit 28–38 days
Certification & registration SONCAP — Confirm per model and importer
HS code Confirmed per model by the customs broker

Market-specific note

Typical sea transit is indicative; confirm the route and schedule with the forwarder before fixing a delivery date.

What we need for a quote

Site type, door or apartment count, existing cable, target country and timeline.

Common project pain points

What usually needs a local decision.

Power stability

Import clearance

Tailgating and visitor flow

Multi-site and multi-building

Recommended configuration

ScenarioRepresentative modelsNotes
Residential Communities CD-Z358, SW-HA-8EZI, TUYA TY75T-HTD2 5 deployment checks
Office Buildings CD-Z358, SW-HA-8ZI, SW-ZCFE-21.5 6 deployment checks
Industrial Parks CD-Z158, TM-AI08FW, TM-UAC109 6 deployment checks

Logistics & clearance

PortTransit
Lagos (Apapa / Tin Can) 28–38 days
Onne 28–38 days
Local scenarios

Start from the site, not the model list.

Frequently asked questions

Questions for Nigeria

What power supply should we plan for Nigeria?

Plan for 230 V / 50 Hz with a generator or UPS-backed circuit and surge protection; confirm the changeover time and lock failure mode.

Which port and transit time apply?

Lagos (Apapa / Tin Can) and Onne are the usual gateways; sea transit is typically 28–38 days, with clearing time on top.

What certification is required?

SONCAP is confirmed per model and importer; start the product certificate and registration before production.

What should we include in an inquiry?

Send the estate layout, unit and gate count, existing cable and target handover date; we will return a configuration and document plan.

Still have a question? Contact

Get a quote

Share the site type, number of doors or apartments, and the functions you need. We will reply with a recommended configuration and a quotation.

By submitting this form you agree that we may contact you about this inquiry. We do not sell your data. Privacy policy

Next step

Send the destination and the door list.

We will confirm voltage, ports, certification and documentation before the quotation.